We were asked by the clinet to build a bridge using some telegraph poles, oak boards were then attached to the poles to link the path on one side of the river to the woodland area on the other. We didn’t need to attach the warning sign, but we thought it was funny as did the client.
Please email or call if you would like to discuss a similar project.
code:
please reference code BR7520